5

Machine Model: BH72kw (purchased in 2020)

Quantity: 1

Application: Use steam to raise the temperature to cause chemical reactions in semi-finished products.

Solution: The size of the drying room is 6*2.5*3 (unit meter), the temperature is raised to 212℉ in one hour and then kept at a constant temperature for 3 hours, so that the steamed cables are resistant to high temperatures and have a long service life.

Client Feedback:

1. The timer installed at the time of purchase can only control the time, which is not very practical. It should be equipped with a temperature control system, which can control the temperature of the constant temperature more accurately;

2. The water treatment equipment will not be connected, and it has been useless;

3. Some time ago, the equipment was not watered or heated, and it returned to normal after replacing the liquid level relay;

On-Site Questions:

1. The equipment starts to run at 10 o'clock in the evening, the 4th gear is fully open, and it works for 4 hours;

2. The reverse connection of the inlet and outlet pipes of the water treatment equipment has been corrected for the customer. The water supply tank is placed flat on the ground, and the pressure is not enough to supply water to the water treatment equipment. It is recommended that the customer add a booster pump;

3. Never discharged sewage before, has been trained how to discharge sewage under pressure and reminded to discharge sewage under pressure every day after the equipment stops running;

4. The control system is normal and the equipment is in good condition.